Build 11 – October (Video) Update

We have some great progress to report this month. During the September and October work sessions, the team, along with some additional volunteers, essentially completed riveting the rear frame extension together. The big Hanna riveter was used for about 85 percent of the work, while hand riveting finished the job. More than 70 rivets have been installed. In locations where it was impossible to drive the rivets properly, fitted bolts will be installed.

Here’s a video showing the Hanna riveter at work, with Rick Sisson operating the Hanna and Jeff Schumaker assisting.

We are pleased to report that the 2022 Build 11 Project fundraising has reached the 85% mark. We’re less than $11,000 from our goal of $70,000. Have you made your contribution at Build11.org yet?